In reverse chronological order:
- 31-Mar-2024 "Driver's Eye" Videos
- 1-Mar-2024 "Golden Spike" Ceremony
- 27-Feb-2024 Front "MU" Connector for Planet 2 Locomotive
- 26-Feb-2024 Trial of Point Indicator
- 25-Feb-2024 First Stage of the Passing Loop
- 7-Feb-2024 Completion of the Main Line
- 6-Feb-2024 Another Day, Another Pipe and More Ballast
- 4-Feb-2024 The Longest Straight
- 29-Jan-2024 Moving a Point
- 25-Jan-2024 More Track Set-Out
- 17-Jan-2024 Progress on Track Construction
- 2-Jan-2024 More Ballasting
- 28-Dec-2023 A Linear Actuator for Point Operation
- 27-Dec-2023 Trial of Auto Couplers
- 15-Dec-2023 New Turnout Installed for Main Line Junction
- 8-Dec-2023 Lift-out Track for Garage Door
- 8-Dec-2023 More Track Arrives!
- 24-Nov-2023 A Rear Headlight for the Planet 2
- 21-Nov-2023 Revised Mainline Alignment
- 19-Nov-2023 Expanding the Wagon Fleet
- 2-Nov-2023 A Utility Wagon
- 4-Oct-2023 End of Tracklaying for Now
- 22-Sep-2023 Maxitrak Planet 2 Locomotive Arrives!
- 10-Sep-2023 Across the Driveway and Beyond
- 7-Sep-2023 Interim Driving Truck
- 30-Jun-2023 The Cutting
- 16-Jun-2023 Ballasting
- 13-Jun-2023 Track Setting Out
- 12-Jun-2023 Stage 1 Track Delivery
- 15-May-2023 Work Begins
- 12-May-2023 Track Plan
Back to Home Page