Since the decision to reroute the main line close to the gazebo, this LH point near the garage is no longer needed in this location, where it had been since June 2023.
The point has been removed, and replaced by straight track and a short (1.5 m) level crossing section for garden maintenance access. |
After being turned around to suit the new planned location, the point is loaded on the train ready for relocation. |
The new location has been readied including conduit buried in the ballast for 12 V power for electric point operation. |
The point in its new position, for now at least. |