A busy day after a morning phone call from the freight company in Albany.
Unloading 3 pallet loads of track, totalling about 150 metres. |
As well as standard straight and curved sections, the shipment included several 1.5 m long level crossing sections and an additional right-hand turnout. |
After a busy few hours, the pallets were unpacked and the track temporarily stored undercover in a breezeway area. |