Thursday, 15 February 2024

First Stage of the Passing Loop

After completing the main line, there were enough track pieces left over to form a siding near the dam.  Another point (right hand) is on order which will eventually be installed where the track runs between the two trees in the background to form a passing loop.

Temporary hook-up of a 12 V battery and linear actuator for controlling the point.  In due course, the battery and solar panel will located in a sunny spot halfway along the passing loop with 12 V power fed to both points via conduits buried in the ballast.

The spacing between the parallel straight tracks is 1.5 m.

After ballasting and installation of a buffer stop, the siding is complete for now.

Some parked wagons to "test" the siding.



Brake Modifications to the New Open Wagons

Both of the new open wagons include electrically-operated parking brakes on one bogie.  Parking brakes are essential as most of the track is...