Saturday, 16 December 2023

New Turnout Installed for the Main Line Junction

To create a new junction for the main line loop, a section of curved track was replaced by a right-hand turnout, which had arrived a few days previously.

Preliminary work, done a couple of weeks previously, to widen the cutting to accommodate the new turnout.

Transporting the new turnout to the worksite.

Curved track and ballast removed.

The deeper excavation will cater for long timber headblocks for installation of the point operating lever.  Also, note new section of weed mat ready for the turnout installation.

The new turnout in place and ballasted.

The start of the new main line diverging to the left.