Wednesday, 22 November 2023
Revised Mainline Alignment
Monday, 20 November 2023
Expanding the Wagon Fleet
A new pair of bogies arrives from DNC!
Friday, 3 November 2023
A Utility Wagon
As it seems delivery of gondola wagons from Mini Train Systems is still some way off, I had been thinking about building another interim wagon to use, especially as the pair of bogies I had ordered from DNC were due to arrive soon.
After figuring out a design in my head one afternoon, I started work and had the wagon built by the following afternoon. The 2 m long timber frame is pine, left over from the pallets used for the track shipment. As with the driving wagon, the bolsters are 50 x 50 steel from a spare fence post. The floor is melamine coated chipboard from a former potting bench which we dismantled some time earlier.
Ready for its first test run.Thursday, 5 October 2023
End of Tracklaying for Now
Further tracklaying in progress beyond the lily pond through an area of fruit trees,
Friday, 22 September 2023
Maxitrak Planet 2 Locomotive Arrives!
It was very well packed in a wooden crate with foam packing on all sides. The battery drill got a workout unscrewing numerous screws holding the crate together.
Finally, after freeing the loco from the crate, one end of the crate was used as a makeshift ramp to roll it down onto the track in the garage.
Sunday, 10 September 2023
Across the Driveway and Beyond
The remaining track to the driveway, on a downgrade, was relatively plain sailing, compared to the cutting.
Thursday, 7 September 2023
Interim Driving Truck
After receiving word from Mini Train Systems that my loco was nearly ready to be shipped but the wagons I had ordered from the were still some months away, I decided I needed to quickly build some sort of wagon to function as a "driving truck", ideally with a manually operated brake.
DNC System Technologies seemed the best source to obtain a pair of bogies, so I ordered a pair of their archbar bogies with the mechanical brake option. After placing the order, DNC responded quickly to my email and provided a drawing showing the overall dimensions including the diameter and height above rail for the bogie pivot.
Armed with this information I designed a rudimentary wagon underframe which I could build with the tools and skill available. I built the underframe in Perth and the 1.2 m length allowed for easy transport in the car to Denmark. The main metal parts are the bolsters, which I cut from a surplus 50 mm square steel fence post, and the end sills which I made from 50 mm galvanised steel angle, also surplus from another project. The idea was that the metal parts would fulfil the main load-bearing requirements, with pine for the remainder all held together with numerous screws and some angle brackets.
Push-Button Remote Control for GP40 Loco
Since I installed the Sabertooth 2x32 motor driver module in my Accucraft GP40, I have been thinking about the option of using a model aircr...
-
One issue that I became aware of some time after placing the order for the GP40 was the difference in wheel standards for 7¼" gauge in ...
-
This project started life as a way to learn to weld, using 25 x 25 mm square steel tube salvaged from a pallet on which a ride-on mower was ...
-
A very exciting day for the railway with arrival of an Accucraft GP40 locomotive which had been on order since January 2025. Towards the en...







.jpg)